Hi Boaters!
We wanted to drop you a note to let you know that the dock replacement project is well under way! 90% of the old docks have been removed. The only original docks remaining are the ones that the new docks are tethered to. All that currently remains of the south dock (red gate) are the pilings, and they are about to be replaced.
It’s all very exciting and we can’t wait for you all to see the progress!
Progress!
The brand new dock system will be finished and spring will be here quickly!
When drafting the new configuration, our customers’ needs were a priority. As you can see, the North and South dock systems are connect (no more going up and around to see your friends on the other dock). And, the North dock reconfiguration makes boating in and out of your slip easier as you come in from the channel (no need to captain your boat near the rocks during low tide).